Special Assessment Projects
2022 Districts Scheduled for Assessment Benefits
Sewer, Water, Storm and Street Improvement District No. 1315.2
Preliminary project cost (Dec. 30, 2020): $540,000
Final cost to be assessed (June 6, 2022): $465,000
Project: Install new City infrastructure to service the Westview Third Addition as requested by the developer, Eid-Co Homes.
- Special Assessment Commission Public Meeting - June 27, 2022
- Resolution Directing Assessments to be Levied - June 6, 2022
- Approve Task Order - April 19, 2021
- Award Contract - Feb. 16, 2021
- Approve Plans and Specifications; Authorize Ad for Bids - Jan. 18, 2021
- Approve Engineers Report - Jan. 4, 2021
Sewer, Water, Storm and Street Improvement District No. 1331
Preliminary project cost (Sept. 8, 2020): $4,850,000
Final cost to be assessed (June 6, 2022) $4,515,000
Project: Install new City infrastructure to service the proposed The Wilds 20th Addition as requested by the developer, Westport Investments, LLC.
- Special Assessment Commission Public Meeting - June 27, 2022
- Resolution Directing Assessments to be Levied - June 6, 2022
- Award Contract - Sept. 8, 2020
- Approve Plans and Specifications; Authorize Ad for Bids - July 20, 2020
- Approve Engineers Report - June 1, 2020
- Create Assessment District - May 18, 2020
Sewer, Water, Storm and Street Improvement District No. 1332
Preliminary project cost (July 16, 2020): $1,300,000
Final cost to be assessed (June 6, 2022): $750,000
Project: Install City infrastructure to service the Westview 4th Addition as requested by the developer, Oakridge Office Condos, LLC.
- Special Assessment Commission Public Meeting - June 27, 2022
- Resolution Directing Assessments to be Levied - June 6, 2022
- Review Bids and Award Contract - Oct. 5, 2020
- Approve Plans and Specifications; Authorize Ad for Bids - Sept. 8, 2020
- Create Assessment District; Approve Engineers Report - July 20, 2020
- Petition for Improvements - July 6, 2020
Sewer, Water, Storm and Street Improvement District No. 1334
Preliminary project cost (Aug. 28, 2020): $1,145,000
Final cost to be assessed (June 6, 2022): $940,000
Project: Install new City infrastructure to service two properties as requested by the developer, Nordick Group, Inc.
- Special Assessment Commission Public Meeting - June 27, 2022
- Resolution Directing Assessments to be Levied - June 6, 2022
- Award Contract - Oct. 5, 2020
- Create Assessment District; Approve Engineers Report; Approve Plans and Specifications; Authorize Ad for Bids - Sept. 8, 2020
- Petition for Improvements - Aug. 17, 2020
Street Improvement District No. 2250
Project Total: $69,766,872.90
Total to be assessed: $32,270,000
Project: Widen Sheyenne Street between Beaton Drive to 40th Avenue and reconstruct the Interstate Highway 94 interchange at Sheyenne Street to address capacity needs, roadway reliability and social and economic development along the proposed corridor
- Special Assessment Commission Public Meeting - June 27, 2022
- Special Assessment Policy Change Discussion - June 6, 2022
- Discussion regarding Special Assessment Policy Changes - Aug. 2, 2021 (minutes)
- Special Assessment Commission Public Hearing - July 12, 2021
- Special Assessment Commission Public Meeting - May 24, 2021
- Resolution Directing Assessments to be Levied - March 1, 2021
Sheyenne Street Urban Reconstruction Improvement District No. 3003
Special assessment funding (March 15, 2021): $1,822,554
Final cost to be assessed: $0
Project: Replace aging infrastructure from Main Avenue W. to Sixth Avenue W. that the core area infrastructure master plan study identified as a critical need for replacement. This includes improvements to water mains, sanitary sewer, and storm sewer throughout the corridor that either is approaching the end of its service life or is undersized.
Upcoming Special Assessment Improvement Districts
Sewer, Water, Storm and Street Improvement District No. 1337
Project: Three separate projects contained within and adjacent to the proposed Wilds 21st Addition install utilities, paving and grading improvements as petitioned by Westport Investments, LLC.
Related Documents
- District No. 1337 Amended Preconstruction Engineers Report
- District No. 1337 Preconstruction Boundary Map
- District No. 1337 Preconstruction Engineers Report
- District No. 1337 Preliminary Preconstruction Assessment Allocation Map
- District No. 1337 Preliminary Preconstruction Benefit Methodology
- District No. 1337 Preliminary Preconstruction Benefit Methodology Map
Sidewalk Improvement District No. 6056
Project: The project consists of sidewalks, multi-use paths and other associated items throughout the City. The locations of work are based on inventory collected in the field by City staff and consist of filling in missing gaps of sidewalks in developed areas and well as some rehabilitation work of deteriorated sidewalks and/or bike paths.
Related Documents
Street Improvement District No. 2264
Project: Install a full traffic signal system adjacent to Sheyenne High School at the intersection of Veterans Boulevard and 37th Avenue E. Improvements will consistent of a 4-way traffic signal system, connection into existing fiber and roadway networks and surface reconstruction to reconfigure crosswalks and the geometry of the left turn lanes of Veterans Boulevard to ensure safe and adequate operations of the new signal system.
Estimate of probably cost (March 21, 2022): $776,190.88
-
Engineer
Physical Address
800 Fourth Ave. E.
Suite 1
West Fargo, ND 58078
Phone: (701) 515-5100